![]() |
|
![]() |
#1 |
Member
Join Date: May 2006
Posts: 7,013
|
![]()
Forget the idea of "three pieces", just focus on time to make a forging from which a keris can be carved.
The bulk of time to make a keris with a plain mlumah pamor is in the carving. Go here:- http://www.kerisattosanaji.com/PBXIImaisey3.html This keris was made 100% in Australia, at Wentworthville, I used a coke forge, I worked completely alone, no striker, no power hammer. It was carved completely with manual tools, no electric tools. It is not a mlumah pamor, I made a mlumah pamor then turned it side on so the central portion of the blade face is adeg, so there is a bit more forge time in it than if I had left it as a wos wutah. Total working time was 16 days, at 6 and 8 hour days, say, +/- 110 to 120 manhours. I do not recall exactly how long the forge time took, but it was probably about 3 days, give or take a bit. It is a normal, full size keris. For comparison, this one:- http://www.kerisattosanaji.com/PBXIImaisey2.html was forged in Solo, working with two strikers, it took 3 days of forge work with two strikers, so 9 mandays. It was forged on charcoal, they were not 8 hour days, more like 6 hour days, or less. It is half size keris, and it is a manipulated (twisted) pamor. I carved it in Australia, again, only manual tools, no electric tools, total working time was +/- 40 carving days + 9 mandays forging, total 49 mandays. |
![]() |
![]() |
![]() |
#2 |
Member
Join Date: Jun 2009
Posts: 1,740
|
![]()
When you think that a full and good quality old kris is sold for about 100$ at some international auctions, I find that it is a shame for the makers, I admire them very much but most people cannot appreciate this exceptional work!
Regards Last edited by Jean; 22nd January 2020 at 01:41 PM. |
![]() |
![]() |
![]() |
#3 |
Member
Join Date: May 2006
Posts: 7,013
|
![]()
Jean, it takes less time for a current era maker to make keris than it took me.
The first real keris I made was under the supervision of Empu Suparman. That took a total of 2 days to forge using two strikers, I did not weld this keris, a local smith was engaged for the forge work, I worked as one of his strikers, so , 3 men, 2 days = 6 man days to forge, then it took me 16 days to carve. Empu Suparman could carve a keris using only hand tools, no electric tools, in 12 to 14 days. At the present time every single current era maker that I know, or know of, uses electric tools, with only the finishing touches done with manual tools. True, keris makers are not richly rewarded, but compared with, let us say, a mechanical fitter or bus driver or a village pande living and working in Central Jawa, they do not fare too badly. If they become well known and their work becomes popular, they can do very, very well indeed. |
![]() |
![]() |
![]() |
|
|