![]() |
![]() |
#10 |
Member
Join Date: May 2006
Posts: 7,015
|
![]()
Yeah, it was Canyon Diablo, and it cost me a fortune. Back then there was no internet or ebay to buy from, so you hunted the stuff from mineral dealers who charged and arm and a leg for a handfull of tiny little bits. I didn't ever start with one lump of the stuff, it was always a handful of little bits , the biggest maybe half inch square, that I brought together in the forge until sticky, then gently tapped together.Finished product was OK though.
Never ever found welding nickel difficult, even in coke. Second bit of damascus I ever made included nickel. With meteorite and also with any old iron, I always like to wash the material until I get no sparks off it.With the meteoritic stuff this was around 7 or 8 welds, with hot short old wheel rims its probably about the same, but with good quality wrought iron from carriage strapping, or similar , three or four welds might be sufficient. |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|